commReach
00IIT Roorkee · student survey

All five survey modules on one page. Switch between rainwater and water waste, or filter the waste charts by bhawan.

Total responses
1,000
200 each across 5 survey modules
Worst waterlogging
SAC to pool / OAT
40 reports, 70% rated severe
Most tap waste
Ganga Bhawan
14 broken or running tap reports
Avg. repair delay
6.8/10
28% blame the four-step approval chain
Where water stands after rain
SAC to pool / OAT and Govind corridors draw the most reports. Bars split by how bad students rated it.
  • Severe (4–5)
  • Moderate (1–3)
What students would build
35% back percolation trenches & recharge pits, mostly along the SAC and LHC paths.
  • Percolation trenches & recharge pits6935%
  • Rooftop harvesting4824%
  • Permeable paving1910%
  • Desilt & re-slope drains137%
  • Reuse for gardens & flushing126%
  • Other (corridors, reservoir)3920%
Best places to catch it
Top suggested catchments. Main Building roofs and SAC + pool path lead; the top three are highlighted.
Why those spots
The reason given with each catchment suggestion.
  • Large catchment area4824%
  • Direct reuse in bhawan3518%
  • Waterlogging prevention2814%
  • Groundwater recharge potential2714%
  • Existing downpipe infrastructure2312%
  • Open flat surface126%
  • Ease of maintenance126%
  • High footfall visibility95%
  • Academic demonstration value63%
commReachn = 1,000 responses · sample dataPress / or ⌘K to jump anywhere